Factory
Built, calibrated and tested in Shanghai
Every instrument is designed to the customer's requirement, machined, assembled, tested and packed before it leaves the works. The five stages below are the ones a buyer walks through on a factory visit, and the inspection route is the same for a single machine as for a batch.

Production capabilities
Design
The machine is designed against the customer's test requirement — force range, specimen size, the standard to be followed and the fixtures needed. Drawings and the control scheme are agreed before any metal is cut.
Machining
Part of the machining is placed with specialist machine shops and the rest is done in-house. Critical fits are checked against the drawing and recorded on the build sheet for that machine.

Assembly
Mechanical, hydraulic and electrical assembly happens in one bay, so the machine is wired and pressure-tested as a complete unit rather than in separate subcontract steps.

Testing
Each machine runs an acceptance test at its working settings: load, displacement and control response are measured and written into the test record that ships with it.
Packing
The machine is packed for the shipping method agreed with the buyer, and the packing list is checked against the order before it leaves.
Inspection route
Four checkpoints, in this order, on every unit:
- 01
Incoming inspection
Incoming components and materials are checked against the purchase specification before they enter the assembly bay.
- 02
Assembly inspection
Dimensional and functional checks during assembly: fits, alignment, hydraulic and pneumatic tightness, wiring.
- 03
Calibration
The measurement chain is calibrated and the values recorded.
- 04
Final inspection
The acceptance run against the ordered specification, followed by packing.
Documents shipped with each machine
Every machine leaves with its own test record: the calibration values and the final acceptance figures, tied to the machine serial number.
- A test record for that individual machine, not a generic datasheet
- The report issued in English or Chinese, stated on the order
- The operating and maintenance manual for the delivered configuration
Buyer questions
Buyer questions
- Can we visit the factory or arrange an audit?
- Yes. Visits and third-party audits can be arranged in advance; please tell us the date and the scope you need.
- Is commissioning and operator training included?
- Commissioning and operator training can be included; the scope is agreed in the quotation so there is no ambiguity later.
- What is the lead time?
- It depends on the configuration and the options you choose, so we confirm the schedule in the quotation rather than quoting one figure.
Request a quote
Send the test item, the standard and the site conditions; the configuration and the delivery scope are confirmed in writing.